Bluecap Co. uses a standard cost system and flexible budgets for control purposes. The following budgeted information pertains to 2019: During 2019, Bluecap worked 28,000 DLHs and manufactured 9,600 units. The actual factory overhead cost for the year was $14,000 greater than the flexible budget amount for the units produced, of which $6,000 was due to fixed factory overhead. In preparing a budget for 2020 Bluecap decided to raise the level of operation to 90% of capacity (a level it considers to be "practical capacity") , to manufacture 9,000 units at a budgeted total of 27,000 DLHs.
The fixed overhead production volume variance for Bluecap Co. in 2019, to the nearest dollar, was:
A) $11,280 favorable.
B) $17,280 favorable.
C) $28,800 unfavorable.
D) $34,800 unfavorable.
E) $51,840 favorable.
Correct Answer:

Verified
Correct Answer:
Verified
Q48: In terms of the variance-investigation decision, an
Q49: Zero Company's standard factory overhead rate is
Q50: If standard cost variances are allocated (i.e.,
Q51: Bonehead Co. has the following factory
Q52: For product-costing purposes, which of the following
Q54: Which one of the following journal entries
Q55: Which of the following statements regarding the
Q56: If the organization is making good progress
Q57: Which of the following would not be
Q58: The following information is available from