Multiple Choice
The ultimate goal of lean operations is to have:
A) no in-process inventories
B) cross-trained workers capable of handling every process
C) a smooth, rapid flow of materials through the system
D) no setup times
E) all of the above
Correct Answer:

Verified
Correct Answer:
Verified
Q6: Preventive maintenance will eliminate the need to
Q13: Process design supporting lean doesn't include _.<br>A)Production
Q14: A potential obstacle to conversion to a
Q15: An operations strategy reflecting the lean philosophy
Q17: Fast and simple are two common threads
Q23: Setup time and its associated cost can
Q30: The lean philosophy recognizes that some work-in-process
Q79: Having a vendor be responsible for managing
Q83: With regard to suppliers, lean systems typically
Q86: Which of the following does not contribute