Multiple Choice
In an MRP master schedule, the planning horizon is often separated into a series of times periods called:
A) pegging
B) lead times
C) stacked lead times
D) time buckets
E) firm, fixed and frozen
Correct Answer:

Verified
Correct Answer:
Verified