Multiple Choice
What are the x-bar chart three sigma upper and lower control limits?
A) 22 and 18
B) 23.29 and 16.71
C) 23.5 and 16.5
D) 23.16 and 16.84
E) 24 and 16
Correct Answer:

Verified
Correct Answer:
Verified