Multiple Choice
In a stopwatch time study, the number of cycles that must be timed is a function of:
A) the variability of observed times
B) the desired accuracy for the estimated job time
C) the desired confidence for the estimated job time
D) all of the above
E) none of the above
Correct Answer:

Verified
Correct Answer:
Verified