Multiple Choice
A job had an observed cycle time of four minutes, a performance rating of 80 percent, and an allowance factor that was 20 percent of job time. Normal time for the job in minutes is:
A) 3.20.
B) 3.84.
C) 4.00.
D) 4.80.
E) 5.00.
Correct Answer:

Verified
Correct Answer:
Verified