Consider the following data supplied by Cotton Tops,a t-shirt distributor:
Calculate the reorder point if a two-week lead time is required for production and shipping.
A) 3250 units.
B) 2500 units.
C) 1000 units.
D) 6333 units.
Correct Answer:

Verified