Multiple Choice
Zero Company's standard factory overhead rate is $3.75 per direct labor hour (DLH) , calculated at 90% capacity = 900 standard DLHs. In December, the company operated at 80% of capacity, or 800 standard DLHs. Budgeted factory overhead at 80% of capacity is $3,150, of which $1,350 is fixed overhead. For December, the actual factory overhead cost was $3,800 for 840 actual DLHs, of which $1,300 was for fixed factory overhead.
Assuming a four-variance breakdown (decomposition) of the total overhead variance, what is the fixed factory overhead efficiency variance (to the nearest whole dollar) for the period?
A) N/A—this variance does not exist.
B) $225 favorable.
C) $425 unfavorable.
D) $650 unfavorable.
Correct Answer:

Verified
Correct Answer:
Verified
Q93: Bonehead Co. has the following factory
Q94: Which of the following would not likely
Q95: Bluecap Co. uses a standard cost
Q96: An activity-based cost (ABC) driver applies factory
Q97: All the following choices exist for defining
Q99: The fixed factory overhead application rate (for
Q100: Causes of random variances are beyond the
Q101: Neptune Inc. uses a standard cost
Q102: You are provided with the following summary
Q103: In framing the decision whether to investigate