Multiple Choice
Typical kinds of costs found in a project include all of the following EXCEPT
A) Direct costs.
B) Project overhead costs.
C) General and administrative overhead costs.
D) Labor.
E) All of these are examples of costs found in a project.
Correct Answer:

Verified
Correct Answer:
Verified