Bluecap Co

Question 13

Multiple Choice

Bluecap Co.uses a standard cost system and flexible budgets for control purposes.The following budgeted information pertains to 2010: Bluecap Co.uses a standard cost system and flexible budgets for control purposes.The following budgeted information pertains to 2010:   During 2010,Bluecap worked 28,000 direct labor hours and manufactured 9,600 units.The actual factory overhead was $14,000 greater than the flexible budget amount for the units produced,of which $6,000 was due to fixed factory overhead.In preparing a budget for 2011 Bluecap decided to raise the level of operation to 90% of capacity,to manufacture 9,000 units at a budgeted total of 27,000 direct labor hours.The total budget for fixed factory overhead in 2010 was: A) $230,400. B) $259,200. C) $265,200. D) $276,480. E) $288,000.
During 2010,Bluecap worked 28,000 direct labor hours and manufactured 9,600 units.The actual factory overhead was $14,000 greater than the flexible budget amount for the units produced,of which $6,000 was due to fixed factory overhead.In preparing a budget for 2011 Bluecap decided to raise the level of operation to 90% of capacity,to manufacture 9,000 units at a budgeted total of 27,000 direct labor hours.The total budget for fixed factory overhead in 2010 was:


A) $230,400.
B) $259,200.
C) $265,200.
D) $276,480.
E) $288,000.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions