Multiple Choice
Xero Company's standard factory overhead rate is $3.75 per direct labor hour (DLH) ,calculated at 90% capacity = 900 standard DLHs.In December,the company operated at 80% of capacity,or 800 standard DLHs.Budgeted factory overhead at 80% of capacity is $3,150,of which $1,350 is fixed overhead.For December,the actual factory overhead cost was $3,800 for 840 actual DLHs,of which $1,300 was for fixed factory overhead.What is the factory overhead production-volume variance for December?
A) $0.
B) $150 unfavorable.
C) $225 favorable.
D) $425 unfavorable.
E) $650 unfavorable.
Correct Answer:

Verified
Correct Answer:
Verified
Q1: Megan,Inc.uses the following standard costs per unit
Q2: The following information is available from the
Q4: The difference between budgeted fixed factory overhead
Q7: Xero Company's standard factory overhead rate is
Q9: The following budget data pertain to the
Q21: What are the four (4) steps in
Q29: In a standard cost system, when production
Q46: Cost behavior for variable overhead is more
Q149: Which of the following statement is true
Q155: When a company uses absorption costing, there