At a production level of 4,500 units, a project has total costs of $108,000. The variable cost per unit is $11.20. Assume the firm can increase production by 1,000 units without increasing its fixed costs. What will the total costs be if 4,800 units are produced?
A) $102,780
B) $104,640
C) $106,400
D) $108,000
E) $111,360