Multiple Choice
What is a project charter?
A) Specific factors that can limit options.
B) Factors that are considered to be true, real, or certain without proof or demonstration.
C) Quantifiable criteria that must be met for the project to be considered a success.
D) A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities.
Correct Answer:

Verified
Correct Answer:
Verified
Q21: What is any measurable, tangible, verifiable outcome,
Q41: A project objective is any measurable, tangible,
Q43: What is feasibility?<br>A) Difficult to quantify or
Q48: A PERT chart is a simple bar
Q57: What measures the practicality of a technical
Q65: Project assumptions are specific factors that can
Q66: What is the most important part of
Q68: An organization must identify what it wants
Q73: What is technical feasibility?<br>A) Measures the cost-effectiveness
Q80: Explain the three different types of outsourcing