Fred's Flooring (FF) contracted with Harry homeowner to install wood flooring throughout Harry's home. Harry was to purchase the flooring, and the contract was solely for installation. Payment was to be 20 percent at the time that the work commenced and 80 percent once the flooring was installed. Harry purchased the flooring materials and paid the 20 percent, so FF began work. When FF's work was halfway completed, Harry realized that he didn't have the money to pay FF on completion, so he bolted the doors and refused access. If FF wants to rescind the contract and be paid for work completed, FF would sue for:
A) compensatory damages.
B) consequential damages.
C) restitution.
D) liquidated damages.
Correct Answer:

Verified
Correct Answer:
Verified
Q17: A court order to refrain from performing
Q32: Kathy and Tom have entered into a
Q47: How does an assignment differ from a
Q54: In what way do legal remedies and
Q61: Craig is a licensed plumber and has
Q63: In a delegation situation,the non-delegating party is
Q63: A delegation will be allowed in which
Q64: In an assignment or delegation, any third-party
Q65: Pete has been fired from his job
Q67: George has entered into a contract with