Multiple Choice
What is the change in the NPV of a one-year project if fixed costs are increased from $400 to $600,assuming the firm is profitable,has a 35% tax rate,and a 12% cost of capital?
A) −$200.00
B) −$178.57
C) −$130.00
D) −$116.07
Correct Answer:

Verified
Correct Answer:
Verified