Multiple Choice
The gross requirements of a part in an MRP system are determined from
A) net requirements + on-hand.
B) net requirements of the end item.
C) gross requirements of the immediate part.
D) planned order releases of the immediate parent item.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q11: Which of the following would NOT likely
Q12: Which of the following is true about
Q13: Planned lead times <br>A) usually are longer
Q14: MRP systems work better in a line
Q15: The master schedule is prepared for product
Q17: The parts explosion results in the following
Q18: A manufacturing execution system (MES)<br>A) is another
Q19: The purpose of the shop floor control
Q20: When a company uses an ERP system,the
Q21: Integration with which of the following functions