Multiple Choice
Which of the following is correct regarding future demand for component parts?
A) Future demand in an order-point system is based on the master production schedule.
B) Future demand in an MRP system is based on the past history of demand for each component part.
C) Future demand in an MRP system is based on the master production schedule.
D) None of the above.
Correct Answer:

Verified
Correct Answer:
Verified
Q34: In MRP "scheduled receipts" are<br>A) identical to
Q35: Bills of materials are kept current with
Q36: When MRP is extended all the way
Q37: The master schedule should be frozen inside
Q38: A replenishment-based system derives orders from<br>A) capacity
Q39: Successful MRP system implementation includes<br>A) implementation planning.<br>B)
Q40: Which system specifies the output of the
Q41: Cycle counting<br>A) is counting a fraction of
Q43: An MRP system makes it possible to<br>A)
Q44: Compare and contrast MRP systems and order-point