Solved

A Process for Filling Liquid Laundry Detergent Bottles Monitors the Volume

Question 6

Multiple Choice

A process for filling liquid laundry detergent bottles monitors the volume in each bottle.The operations manager has taken 5 samples with 4 observations (bottles) in each sample to determine if the variation in volume is reasonable.The measurement unit is fluid ounces.Calculate the center line for a process control chart that indicates whether the variation within samples is reasonable (in a state of control) . A process for filling liquid laundry detergent bottles monitors the volume in each bottle.The operations manager has taken 5 samples with 4 observations (bottles) in each sample to determine if the variation in volume is reasonable.The measurement unit is fluid ounces.Calculate the center line for a process control chart that indicates whether the variation within samples is reasonable (in a state of control) .   A)  >1.0.  B)  Between 0 and 1.0. C)  Less than 0. D)  There is not enough information to determine the correct response.


A) >1.0.
B) Between 0 and 1.0.
C) Less than 0.
D) There is not enough information to determine the correct response.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions