Multiple Choice
External setup time refers to
A) the time it takes workers to set up a machine during scheduled maintenance.
B) the time to complete setup activities that do not require that the machine be stopped.
C) the time it takes equipment vendors to set up the machine.
D) none of the above.
Correct Answer:

Verified
Correct Answer:
Verified
Q23: The basic foundation of the Toyota production
Q24: A kanban card is used to signal
Q25: Value stream maps are similar to flowcharts
Q26: "Gemba" refers to data collection using the
Q27: Why is a uniform load desirable in
Q29: Define the English terms in the 5S
Q30: In lean thinking,inventory hides a variety of
Q31: One-touch setups could require as long as
Q32: Which of the following is NOT an
Q33: With lean thinking,a firm's operations layout should