Multiple Choice
Which of the following is NOT a change associated with a lean production system?
A) Reduced inventory storage space is needed.
B) Reduced automation as lot size approaches one unit.
C) Workers take responsibility for most maintenance of the equipment they use.
D) Routine preventive maintenance time is provided between shifts.
Correct Answer:

Verified
Correct Answer:
Verified
Q33: With lean thinking,a firm's operations layout should
Q34: What are the seven forms of waste
Q35: Takt time is the demand for the
Q36: One of the keys to reducing inventory
Q37: _ is(are)the direct observation of work,conducted so
Q39: Explain the concept of value stream mapping.
Q40: The seven forms of waste include all
Q41: A kanban system cannot be used in
Q42: Which of the following best represents the
Q43: Which of the following statements regarding lean