Multiple Choice
Quality control charts usually have a central line and upper and lower control limit lines.Which of the following is not a reason that the process being monitored with the chart should be investigated?
A) A large number of plots are close to the upper or lower control lines.
B) The behaviorbehaviour of the plots is erratic.
C) A single plot falls above or below the control limits.
D) TheeThere is a change in raw materials or operators.
E) There is a run of five above the central line.
Correct Answer:

Verified
Correct Answer:
Verified
Q21: Standard practice in statistical process control for
Q28: In acceptance sampling, the number of units
Q31: You want to determine the lower control
Q31: You are going to develop an X-bar
Q32: Comparing traditional view of the cost of
Q33: You are developing an X-bar chart based
Q34: LTPD in acceptance sampling stands for lot
Q47: For which of the following should we
Q50: In monitoring process quality, we might use
Q64: You have just used the capability index