Multiple Choice
In a work center, machine A has a 10-minute set-up time per batch and a 2-minute per unit run time.Machine B performs the identical function but has a set-up time of 30 minutes and a 1-minute run time per unit.The work center makes products in batches ranging from 1 unit to 100 units.Assuming capacity is not a limitation on either machine, in order to minimize the total processing time, on which batches should machine B be used?
A) All batches should be run on machine B.
B) Batches of more than 20 units should be run on machine B.
C) Batches of fewer than 80 units should be run on machine B.
D) Batches with up to 50 units should be run on machine B.
E) No batches should be run on machine B.
Correct Answer:

Verified
Correct Answer:
Verified
Q10: Assemble-to-order means moving the customer order decoupling
Q27: You are hired as a consultant to
Q31: In studying product-process matrix describing layout strategies,
Q32: The placement of which of the following
Q35: A project layout is characterized by a
Q38: The closer the customer is to the
Q40: A general-purpose machine is less capable than
Q48: The term "assembly line" refers to progressive
Q48: Which of the following basic types of
Q50: Engineer-to-order firms will work with the customer