Multiple Choice
Suppose that Job A involves 30% hand assembly (manual work) and 70% machining (machine controlled work) , Job B involves 50% hand assembly (manual work) and 50% machining (machine controlled work) and Job C involves 70% hand assembly (manual work) and 30% machining (machine controlled work) .Comparing the learning percent in each of the three jobs using general guidelines, which of the following is correct?
A) Learning percent in job A < leaning % in Job B < learning percent in job C
B) Learning percent in job A > leaning % in Job B > learning percent in job C.
C) Learning percent in job A = leaning % in Job B = learning percent in job C.
D) Learning percent in job A < leaning % in Job C < learning percent in job B.
E) Learning percent in job A > leaning % in Job B > learning percent in job C
Correct Answer:

Verified
Correct Answer:
Verified
Q3: You have just timed a person doing
Q4: You have just timed a person doing
Q7: You have determined that a 75 percent
Q8: When plotted on a graph, the learning
Q10: If a person performing a task has
Q16: Learning curves can be applied to individuals
Q20: On a learning curve plot, the time
Q30: Economies of scale and the learning curve
Q35: The 50<sup>th</sup> repetition of a job is
Q53: A learning curve is a line displaying