Multiple Choice
In evaluating this sample,the auditor decided to increase the level of the preliminary assessment of control risk because the:
A) Tolerable rate of deviation (7%) was less than the upper limit rate of deviation (8%) .
B) Expected population deviation rate (7%) was more than the percentage of errors in the sample (3.5%) .
C) Expected population deviation rate (2.5%) was less than the tolerable rate of deviation.
D) Upper limit rate of deviation (8%) was more than the percentage of errors in the sample (3.5%) .
Correct Answer:

Verified
Correct Answer:
Verified
Q69: As a result of tests of controls,an
Q70: Using the appropriate sampling tables,identify the
Q71: Which of the following statements is correct
Q72: The AICPA has developed sample size tables
Q73: For which of the following audit tests
Q75: The allowance for sampling risk was:<br>A)5.5%.<br>B)4.5%.<br>C)3.5%.<br>D)1%.
Q76: In order for the auditor to decide
Q77: What is an auditor's evaluation of a
Q78: Walters created a list of all
Q79: As a result of tests of controls,an