Multiple Choice
Likely reasons for inaccurate control limits would include which of the following?
A) The engineering parameter for variance is unknown.
B) The engineers were underpaid for their work.
C) There was insufficient preliminary sampling.
D) Process variation was not zero, as expected.
Correct Answer:

Verified
Correct Answer:
Verified