Multiple Choice
The operations manager for the Blue Moon Brewing Co. produces two beers: Lite (L) and Dark (D) . Two of his resources are constrained: production time, which is limited to 8 hours (480 minutes) per day; and malt extract (one of his ingredients) , of which he can get only 675 gallons each day. To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract, while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract. Profits for Lite beer are $3.00 per keg, and profits for Dark beer are $2.00 per keg. What is the objective function?
A) $2 L + $3 D = Z
B) $2 L + $4 D = Z
C) $3 L + $2 D = Z
D) $4 L + $2 D = Z
E) $5 L + $3 D = Z
Correct Answer:

Verified
Correct Answer:
Verified
Q8: A local bagel shop produces two products:
Q9: _ is/are a mathematical expression that can
Q10: A local bagel shop produces two products:
Q11: For the products A, B, C, and
Q12: Which of the following is not a
Q14: A local bagel shop produces two products:
Q15: _ is/are numerical constants used in linear
Q16: The production planner for a private label
Q17: In a linear programming problem, the objective
Q18: A novice linear programmer is dealing with