Multiple Choice
A design engineer wants to construct a sample mean chart for controlling the service life of a halogen headlamp his company produces. He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours. On three recent production batches, he tested service life on random samples of four headlamps, with these results: If he uses upper and lower control limits of 520 and 480 hours, on what sample(s) (if any) does service life appear to be out of control?
A) sample 1
B) sample 2
C) sample 3
D) both samples 2 and 3
E) all samples are in control
Correct Answer:

Verified
Correct Answer:
Verified
Q10: The chair of the operations management
Q11: Given the following process control data
Q12: The following data occurs chronologically from
Q16: A quality analyst wants to construct
Q17: A process that makes chocolate candy bars
Q18: A quality analyst wants to construct
Q19: When a process is in control, it
Q73: A p-chart would be used to monitor<br>A)average
Q79: The primary purpose of statistical process control
Q92: Range control charts are used to monitor