Multiple Choice
The chair of the operations management department at Quality University wants to construct a p-chart for determining whether the four faculty teaching the basic P/OM course are under control with regard to the number of students who fail the course. Accordingly, he sampled 100 final grades from last year for each instructor, with the following results: What are the .95 (5 percent risk of Type I error) upper and lower control limits for the p-chart?
A) .95 and .05
B) .13 and .07
C) .1588 and .0412
D) .16 and .04
E) .1774 and .0226
Correct Answer:

Verified
Correct Answer:
Verified
Q12: Approving the effort that occurs during the
Q26: The output of a process may not
Q48: A quality analyst wants to construct
Q49: A stent for use in coronary surgery
Q50: A quality analyst wants to construct
Q52: A quality analyst wants to construct
Q54: The optimum level of inspection minimizes the
Q57: A quality analyst wants to construct
Q77: The basis for a statistical process control
Q78: The specifications for a product are 6