Multiple Choice
A methods and measurements analyst needs to develop a time standard for a certain task. In a preliminary study, he observed one of his workers perform this task five times, with the following results: What is the standard time for this task if the employee worked at a 25 percent faster pace than average and an allowance of 20 percent of job time is used?
A) 80 seconds
B) 96 seconds
C) 100 seconds
D) 120 seconds
E) 125 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q33: The chart used to review the overall
Q69: A technique for estimating the proportion of
Q79: One important factor that influences productivity is
Q95: The methods analysis chart which describes the
Q118: A methods and measurements analyst for
Q120: A methods and measurements analyst for
Q121: The owner of Kat Motel wants
Q124: Eight instances of a worker doing
Q125: Given the following work sampling data,
Q126: Increasing compensation is always a way to