Multiple Choice
A methods and measurements analyst for Timepiece, Inc., needs to develop a time standard for the task of attaching a watch to a wristband. In a preliminary study, he observed one of his workers perform this task five times, with the following results: What is the observed time for this task?
A) 20 seconds
B) 27 seconds
C) 46 seconds
D) 66 seconds
E) 100 seconds
Correct Answer:

Verified
Correct Answer:
Verified
Q22: The manager of Lawn and Garden
Q23: Eight instances of a worker doing
Q24: One potential disadvantage of self-directed teams is
Q27: A behavioral approach to job design which
Q29: A time study of a job produced
Q38: A major advantage of job specialization in
Q46: The standard time for a job can
Q106: A worker-machine chart can help identify nonproductive
Q116: The symbols for operation, storage, transportation, inspection,
Q174: A simo chart includes:<br>A)delay.<br>B)storage.<br>C)transportation.<br>D)left/right hand movements.<br>E)inspection.