The operations manager of a mail order house purchases double (D) and twin (T) beds for resale. Each double bed costs $500 and requires 100 cubic feet of storage space. Each twin bed costs $300 and requires 90 cubic feet of storage space. The manager has $75,000 to invest in beds this week, and her warehouse has 18,000 cubic feet available for storage. Profit for each double bed is $300 and for each twin bed is $150.
-Which of the following is not a feasible solution?
A) (D,T) = (0,0)
B) (D,T) = (0,250)
C) (D,T) = (150,0)
D) (D,T) = (90,100)
E) (D,T) = (0,200)
Correct Answer:

Verified
Correct Answer:
Verified
Q3: A manager should know the following things
Q4: Given the following 2 constraints,which solution is
Q7: The operations manager for the Blue Moon
Q13: The owner of Crackers, Inc. produces both
Q20: An objective function represents a family of
Q29: All constraints in a linear programming problem
Q51: The equation 3 xy = 9 is
Q63: The equation 5 x + 7 y
Q63: When formulating a linear programming problem on
Q71: Which objective function has the same slope