Essay
A plant manager for a sporting goods manufacturer is in charge of assigning the manufacture of four new aluminum products to four different departments.Because of varying expertise and workloads,the different departments can produce the new products at various rates.If only one product is to be produced by each department and the daily output rates are given in the table below,which department should manufacture which product to maximize total daily product output? (Note: Department 1 does not have the facilities to produce golf clubs.) Formulate this assignment problem as a linear program.
Correct Answer:

Verified
Correct Answer:
Verified
Q4: The direction of flow in the shortest-route
Q19: A transshipment problem is a generalization of
Q29: Consider a shortest-route problem in which a
Q41: Converting a transportation problem LP from cost
Q42: Fodak must schedule its production of camera
Q48: Write the LP formulation for this transportation
Q54: Consider the following shortest-route problem involving
Q56: Find the maximal flow from node 1
Q57: Show both the network and the
Q59: Whenever total supply is less than total