Solved

(Appendix 2A) Adelberg Corporation Makes Two Products: Product a and Product

Question 19

Multiple Choice

(Appendix 2A) Adelberg Corporation makes two products: Product A and Product B. Annual production and sales are 500 units of Product A and 1,000 units of Product B. The company has traditionally used direct labor-hours as the basis for applying all manufacturing overhead to products. Product A requires 0.4 direct labor-hours per unit and Product B requires 0.2 direct labor-hours per unit. The total estimated overhead for next period is $68,756.
The company is considering switching to an activity-based costing system for the purpose of computing unit product costs for external reports. The new activity-based costing system would have three overhead activity cost pools--Activity 1, Activity 2, and General Factory--with estimated overhead costs and expected activity as follows:
(Appendix 2A)  Adelberg Corporation makes two products: Product A and Product B. Annual production and sales are 500 units of Product A and 1,000 units of Product B. The company has traditionally used direct labor-hours as the basis for applying all manufacturing overhead to products. Product A requires 0.4 direct labor-hours per unit and Product B requires 0.2 direct labor-hours per unit. The total estimated overhead for next period is $68,756. The company is considering switching to an activity-based costing system for the purpose of computing unit product costs for external reports. The new activity-based costing system would have three overhead activity cost pools--Activity 1, Activity 2, and General Factory--with estimated overhead costs and expected activity as follows:    (Note: The General Factory activity cost pool's costs are allocated on the basis of direct labor-hours.)  -The predetermined overhead rate (i.e.,activity rate) for Activity 2 under the activity-based costing system is closest to: A)  $13.91 B)  $11.71 C)  $74.16 D)  $36.19 (Note: The General Factory activity cost pool's costs are allocated on the basis of direct labor-hours.)
-The predetermined overhead rate (i.e.,activity rate) for Activity 2 under the activity-based costing system is closest to:


A) $13.91
B) $11.71
C) $74.16
D) $36.19

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions