Multiple Choice
When an auditor increases the planned assessed level of control risk because certain control activities were determined to be ineffective,the auditor would most likely increase the
A) Extent of tests of details.
B) Level of inherent risk.
C) Extent of tests of controls.
D) Level of detection risk.
Correct Answer:

Verified
Correct Answer:
Verified
Q26: Internal control consists of six components.
Q28: The auditor must understand internal control before
Q75: Walkthroughs usually involve all of the following
Q93: Assume that an auditor estimates that 10,000
Q94: Assessing control risk at a lower level
Q95: A field test is a<br>A) Test to
Q96: A high detection risk strategy includes all
Q98: A customer intended to order 100 units
Q100: For certain controls,such as segregation of duties,documentary
Q101: Potential benefits of an entity's controls in