Multiple Choice
As the acceptable level of detection risk increases,an auditor may change the
A) Assessed level of control risk from below the maximum to the maximum level.
B) Assurance provided by tests of controls by using a larger sample size than planned.
C) Timing of substantive procedures from year-end to an interim date.
D) Nature of substantive procedures from less effective to more effective procedures.
Correct Answer:

Verified
Correct Answer:
Verified
Q8: Describe the limitations of internal control. Why
Q12: Why might an auditor decide to test
Q22: The basic concept of internal control that
Q54: Which of the following procedures most likely
Q64: An entity's IT infrastructure refers to:<br>A)Hardware components.<br>B)Programmers.<br>C)Software.<br>D)Data
Q73: Based on a study and evaluation completed
Q74: Of the following statements about an internal
Q76: A field test is a<br>A) Test to
Q80: In evaluating internal control,the auditor is basically
Q101: Potential benefits of an entity's controls in