Multiple Choice
For an attributes sampling plan,the tolerable deviation rate is 4.5%,the computed upper deviation rate is 7%,the sample deviation rate is 3%,and the desired confidence level is 95%.What is the allowance for sampling risk included in the computed upper deviation rate?
A) 1.5%.
B) 3%.
C) 4%.
D) 5%.
The computed upper deviation rate includes the sample deviation rate and the allowance for sampling risk. Therefore, if we subtract the sample deviation rate from the computed upper deviation rate, the difference is the achieved allowance for sampling risk, or 4% (7% - 3%) .
Correct Answer:

Verified
Correct Answer:
Verified
Q4: Which of the following factors does an
Q7: Confidence level and sampling risk are related
Q14: Before performing sampling procedures in an audit
Q23: Your uncle Bob, a CPA, has recently
Q34: Based on a 5% risk of assessing
Q47: In determining the sample size for a
Q52: When testing automated IT controls,the auditor is
Q59: Harvey Jones, CPA, uses statistical sampling to
Q62: The tolerable deviation rate for a test
Q64: In nonstatistical sampling for tests of controls,