Multiple Choice
A manufacturing company produces part 2205 for the aerospace industry. This particular part can be manufactured using 3 different production processes. The management wants to know if the quality of the units of part 2205 is the same for all three processes. The production supervisor obtained the following data: Process 1 had 29 defective units in 240 items; Process 2 produced 12 defective units in 180 items, and Process 3 manufactured 9 defective units in 150 items. At a significance level of .05, the management wants to perform a hypothesis test to determine whether the quality of items produced appears to be independent of the production process used.
-Calculate the expected number of defective units produced by Process 1.
A) 29
B) 21.053
C) 218.947
D) 6.042
E) 10.786
Correct Answer:

Verified
Correct Answer:
Verified
Q8: Consider the 3 × 2 contingency
Q9: At a significance level of .05,test H<sub>0</sub>:
Q10: A manufacturing company produces part 2205 for
Q11: At a significance level of .05,test H<sub>0</sub>:
Q11: When we carry out a chi-square test
Q12: A manufacturing company produces part 2205 for
Q14: On the most recent tax cut
Q16: A manufacturing company produces part 2205 for
Q18: Consider the 3 × 2 contingency
Q117: When we carry out a chi-square goodness