Multiple Choice
Which of the following is not a desirable management action to relieve the bottleneck constraint of the assembly operation?
A) Eliminate idle time at the bottleneck operation.
B) Shift products that do not have to be made on the bottleneck machine to nonbottleneck machines,or to outside processing facilities.
C) Reduce setup time and processing time at bottleneck operations.
D) Improve the quality of parts,or products manufactured,at the bottleneck operation.
E) Emphasize that poor quality is less costly at a bottleneck operation compared to the nonbottleneck operation.
Correct Answer:

Verified
Correct Answer:
Verified
Q21: The manager at the Doughnut Factory is
Q22: Overhead costs allocated to a sales office
Q23: The amount of joint costs incurred before
Q24: Is book value of existing equipment relevant
Q25: In which step of the performance-evaluation model
Q27: List and describe the three measures defined
Q28: An incremental cost is the additional total
Q29: Rent,general administration,and corporate-office costs are _ costs
Q30: Seedem Manufacturing was approached by the international
Q31: International outsourcing requires managers to evaluate manufacturing