Shorts, Inc. produces small engines. For last year's operations, the following data were gathered: Shorts, Inc. employs a standard costing system. During the year, a variable overhead rate of $8.00 was used. The labor standard requires 1.5 hours per unit produced. The variable overhead spending and efficiency variances are, respectively
A) $100,000 U and $20,000 U.
B) $100,000 U and $20,000 F.
C) $20,000 U and $80,000 U.
D) $20,000 U and $80,000 F.
E) None of these.
Correct Answer:

Verified
Correct Answer:
Verified
Q9: When overhead is applied on the basis
Q32: The two variances for fixed overhead are<br>A)
Q81: Match the following terms with the items
Q112: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2048/.jpg" alt=" -Refer to Figure
Q113: Because activities are what consume resources, activity-based
Q115: A _ enables a firm to compute
Q117: The formula for the fixed overhead spending
Q118: In an activity flexible budget, the variable
Q119: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2048/.jpg" alt=" The company expects
Q139: A _ compares actual costs with budgeted