Owens Corporation Produces Specially Machined Parts Owens Produces Two Models: Model X and Model Y

Question 93

Multiple Choice

Owens Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers:
 Activity  Expected Cost  Activity Driver  Activity Capacity  Engineering $1,000,000 engineerng hours 5,000 hours  Setups $900,000 setups 200 setups  Machining $2,000,000 machine hours 25,000 machine hours  Inspection $800,000 inspection hours 2,500 inspection hour \begin{array}{llll}\text { Activity } & \text { Expected Cost } & \text { Activity Driver }&\text { Activity Capacity }\\\text { Engineering } & \$ 1,000,000 & \text { engineerng hours } & 5,000 \text { hours } \\\text { Setups } & \$ 900,000 & \text { setups } & 200 \text { setups } \\\text { Machining } & \$ 2,000,000 & \text { machine hours } & 25,000 \text { machine hours } \\\text { Inspection } & \$ \quad 800,000 & \text { inspection hours } & 2,500 \text { inspection hour }\end{array} Owens produces two models: Model X and Model Y.The following table shows how the two products consume activity.
 Model X  Model Y  Units completed 300,000200,000 Engineering hours 1,0004,000 Setups 80120 Machine hours 20,0005,000 Inspection hours 1,5001,000\begin{array}{lll}&\text { Model X }&\text { Model Y }\\\hline \text { Units completed } & 300,000 & 200,000 \\\text { Engineering hours } & 1,000 & 4,000 \\\text { Setups } & 80 & 120 \\\text { Machine hours } & 20,000 & 5,000 \\\text { Inspection hours } & 1,500 & 1,000\end{array}
-Refer to the figure.Using the activity ratios for engineering and machining,what is the overhead rate for machining (rounded to two decimal places) ?


A) $112.80
B) $376.00
C) $541.50
D) $872.60