The following information relates to Ramesy Manufacturing:
To produce a unit of product
There is a wait time of 5 minutes before the Cutting Department begins a batch, 15 minutes between the Cutting and Welding departments, a move and pre-wait between Welding and Polishing of 12 minutes, and a move and pre-wait between the Polishing and Finishing departments of 8 minutes.
-Refer to the figure.What is the cycle time of operation?
A) 16 minutes
B) 20 minutes
C) 35 minutes
D) 60 minutes
Correct Answer:

Verified
Correct Answer:
Verified
Q100: Information about Blair Company is as
Q102: Information about Hinze Corporation is as
Q103: How do we calculate the productivity ratio
Q104: Information about Cheng Corporation is as
Q106: The following information relates to Markely
Q107: What does the lean control system use
Q108: Information about Cheng Corporation is as
Q109: At the end of 20X1, Gilley
Q110: Which of the following conditions is NOT
Q160: Discuss the linkage between quality and productivity.