Multiple Choice
Why might labour costs be reduced in a value stream system?
A) The reduction causes an elimination of the need for any specialized skilled employees such as industrial engineers or production schedulers.
B) The labour costs of industrial engineers and production schedulers can be pooled and allocated to the value streams.
C) Some of the workers can be cross-trained to perform value-added activities within the value stream.
D) Typically,implementing value stream results in layoffs of many workers.
Correct Answer:

Verified
Correct Answer:
Verified
Q5: What does the features and characteristics approach
Q6: What does an operational productivity measure use
Q7: What is productivity concerned with producing?<br>A)rapid output<br>B)efficient
Q8: At the end of 20X1,Cabot Company
Q9: Information about Gausen Company is as
Q11: Theis Incorporated has the following departmental structure
Q12: What does the profit linkage rate?<br>A)It calculates
Q13: At the end of 20X1, Gilley
Q15: Information about Blair Company is as
Q145: What approach is normally used to calculate