Multiple Choice
The lag length in a VAR using the BIC proceeds as follows: Among a set of candidate values of p, the estimated lag length xxxis the value of p
A) For which the BIC exceeds the AIC
B) That maximizes BIC(p)
C) Cannot be determined here since a VAR is a system of equations, not a single one
D) That minimizes BIC(p)
Correct Answer:

Verified
Correct Answer:
Verified
Q28: The order of integration<br>A)can never be zero.<br>B)is
Q29: The EG-ADF test<br>A)is the similar to the
Q30: One advantage of forecasts based on a
Q31: For the United States, there is somewhat
Q32: Unit root tests<br>A)use the standard normal distribution
Q34: You have collected quarterly data for
Q35: ?<sup>2</sup>Y<sub>t</sub><br>A)= ?Y<sub>t</sub> - ?Y<sub>t</sub><sub>-</sub><sub>1</sub>.<br>B)= <span
Q36: Purchasing power parity (PPP), postulates that
Q37: There has been much talk recently
Q38: Carefully explain the difference between forecasting variables