Multiple Choice
A standard cost method is based on
A) variable costs only.
B) a predetermined average cost per input.
C) a predetermined average total input cost per unit of output.
D) either a predetermined average cost per input or a predetermined average total input cost per unit of output.
E) historical costs.
Correct Answer:

Verified
Correct Answer:
Verified