Multiple Choice
Engineering costs incurred to change product designs are which of the following?
A) market-sustaining costs
B) output unit-level costs
C) batch-level costs
D) product-sustaining (service-sustaining) costs
E) facility-sustaining costs
Correct Answer:

Verified
Correct Answer:
Verified