Use this scenario for the following question(s) .
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
-Refer to the scenario above. How many workstations must be added to increase the output rate to one unit per minute?
A) 1
B) 2
C) 3
D) 4
Correct Answer:

Verified
Correct Answer:
Verified
Q24: The only way to ensure that a
Q25: Batch processing is less flexible than a
Q26: A supply chain can have _ manufacturing
Q27: Define the terms front room and back
Q28: Products that use standard components but the
Q30: A complete makeover by Jose Eber on
Q31: Activities that take place prior to the
Q32: The product-process matrix illustrates that low volume,
Q33: Regardless of the number of tasks or
Q34: Use this scenario for the following