A Proposed Engineering Control Is Expected to Cut the Accident

Question 23

Essay

A proposed engineering control is expected to cut the accident rate in half for a given process. Cost data for accidents with this process have been estimated by auditors as follows (average cost per accident):

A proposed engineering control is expected to cut the accident rate in half for a given process.  Cost data for accidents with this process have been estimated by auditors as follows (average cost per accident):     Calculate the total annual accident cost reduction benefit expected for this proposed engineering control.

Calculate the total annual accident cost reduction benefit expected for this proposed engineering control.

Correct Answer:

verifed

Verified

Benefit = 1/2 [ 200x6.0 + 1100...