Short Answer
Based on an earlier model called the Shewhart cycle,the Plan-Do-Check-Act (PDCA)cycle was popularized in the 1950's by ____________________.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q1: Variations in process output that are caused
Q2: Twenty-five samples of size 4 were
Q4: For control chart,the lower and upper control
Q5: According to Greg Brue,author of Six Sigma
Q6: Forty samples of size 1,000 were drawn
Q7: Which of the following are among the
Q8: Differentiate between statistical process control and acceptance
Q9: The two sources of process variation are
Q10: What is the difference between total quality
Q11: When the purpose of sampling is to