Multiple Choice
The operations manager for the Blue Moon Brewing Co. produces two beers: Lite (L) and Dark (D) . He can only get 675 gallons of malt extract per day for brewing and his brewing hours are limited to 8 hours per day. To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract. Each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract. Profits for Lite beer are $3.00 per keg and profits for Dark beer are $2.00 per keg.
-What is the time constraint?
A) 2L +3D ≤ 480
B) 2L + 4D ≤ 480
C) 3L + 2D ≤ 480
D) 4L + 2D ≤ 480
E) 5L + 3D ≤ 480
Correct Answer:

Verified
Correct Answer:
Verified
Q18: One of the great strengths of spreadsheets
Q24: A maximization problem can generally be characterized
Q32: If a single optimal solution exists while
Q57: The operations manager of a mail order
Q58: Which of the following is not a
Q59: The owner of Crackers, Inc. produces both
Q63: What is the optimal solution for the
Q64: The operations manager of a mail order
Q66: The production planner for a private label
Q79: For a graph where the horizontal axis