Multiple Choice
The production planner for a private label soft drink maker is planning the production of two soft drinks: root beer (R) and sassafras soda (S) . There are at most 12 hours per day of production time and 1500 gallons per day of carbonated water available. A case of root beer requires 2 minutes of time and 5 gallons of water to produce, while a case of sassafras soda requires 3 minutes of time and 5 gallons of water. Profits for the root beer are $6.00 per case, and profits for the sassafras soda are $4.00 per case.
-Which of the following is not a feasible solution?
A) (R,S) = (0,0)
B) (R,S) = (0,240)
C) (R,S) = (180,120)
D) (R,S) = (300,0)
E) (R,S) = (180,240)
Correct Answer:

Verified
Correct Answer:
Verified
Q17: What is the time constraint?<br>A) 2R +
Q34: The value of the objective function decreases
Q35: When solving a maximization problem graphically, it
Q38: Linear programming allows a manager to find
Q41: What is the constraint for Dominican beans?<br>A)12A
Q42: For the products A,B,C,and D,which of the
Q44: Where are the output cells located?<br>A)B2:C2 <br>B)B2:C2,B5:C7,and
Q46: An electronics firm produces two models of
Q50: Constraints limit the alternatives available to a
Q66: All linear programming models have an objective